Home - Return to Previous Page
Additional Images

Alliant Power Long Lead (Blue Harness) HEUI Injector For 99-03 7.3L Powerstroke

AP63804AE
Pricing: $264.58

Customize Your Item

- -Please Select- -
 * required
CA Prop 65
Qty:
FREE Ground Shipping

Description

Alliant Power Long Lead (Blue Harness) HEUI Injector For 1999-2003 Ford 7.3L Powerstroke 

 

The Alliant AP63804AE HEUI Injector is a direct fit for your 1999-2003 Ford 7.3L Powerstroke. Long Lead (LL or blue harness connector) Injector. Engines built AFTER 12/07/1998. Used in #8 cylinder to eliminate "cackle" (Per Ford Bulletins 00-10-1, 00-22-1, and 01-14-6). Alliant Power provides OEM quality, without the OEM price. Keeping Original Equipment Manufacturer (OEM) product as the preferred service part so vehicles and equipment continue to perform like new and provide you with greater satisfaction. This is a single Injector.


OEM Part Numbers:

  • F81Z9E527EARM
  • XC3Z9E527AARM
  • F61Z9VE527ERM
  • 5C3Z9VE527ARM

 

 

Fitment Chart:

Make Model Years Engine Model Notes
Ford F-250 1999 to 2003 Ford 7.3L Power Stroke F Series
Ford F-350 1999 to 2003 Ford 7.3L Power Stroke F Series
Ford F-450 1999 to 2003 Ford 7.3L Power Stroke F Series
Ford F-550 1999 to 2003 Ford 7.3L Power Stroke F Series
Ford F-650 1999 to 2003 Ford 7.3L Power Stroke F Series
Ford F-750 1999 to 2003 Ford 7.3L Power Stroke F Series
Ford F Series 1999 to 2003 Ford 7.3L Power Stroke F Series
Ford E-250 1999 to 2003 Ford 7.3L Power Stroke E Series
Ford E Series 1999 to 2003 Ford 7.3L Power Stroke E Series
Ford E-350 1999 to 2003 Ford 7.3L Power Stroke E Series
Ford E-450 1999 to 2003 Ford 7.3L Power Stroke E Series
Ford E-550 1999 to 2003 Ford 7.3L Power Stroke E Series
Navistar   2002 to 2003 Navistar T444E T444E

 

Details

  • AP63804AE
  • AP63804AE
  • Alliant Power
  • New

Shipping Information

  • Item Requires Shipping
  • 5.0 lbs.
  • W6.0000” x H6.0000” x L6.0000”
  • FREE Ground Shipping

Customer Reviews

Comment Total Reviews (0)

Write the First Review!

You must login to post a review.