Image of Alliant Power Long Lead (Blue Harness) HEUI Injector For 99-03 7.3L Powerstroke
Image of Alliant Power Long Lead (Blue Harness) HEUI Injector For 99-03 7.3L Powerstroke
Image of Alliant Power Long Lead (Blue Harness) HEUI Injector For 99-03 7.3L Powerstroke
Image of Alliant Power Long Lead (Blue Harness) HEUI Injector For 99-03 7.3L Powerstroke
Image of Alliant Power Long Lead (Blue Harness) HEUI Injector For 99-03 7.3L Powerstroke
Image of Alliant Power Long Lead (Blue Harness) HEUI Injector For 99-03 7.3L Powerstroke
Image of Alliant Power Long Lead (Blue Harness) HEUI Injector For 99-03 7.3L Powerstroke
Image of Alliant Power Long Lead (Blue Harness) HEUI Injector For 99-03 7.3L Powerstroke

Alliant Power Long Lead (Blue Harness) HEUI Injector For 99-03 7.3L Powerstroke

SKU: AP63804AE
$375.99
$375.99
$0.00

Free Shipping

Free ground shipping on all orders over $99

Alliant Power Long Lead (Blue Harness) HEUI Injector For 1999-2003 Ford 7.3L Powerstroke

The Alliant AP63804AE HEUI Injector is a direct fit for your 1999-2003 Ford 7.3L Powerstroke. Long Lead (LL or blue harness connector) Injector. Engines built AFTER 12/07/1998. Used in #8 cylinder to eliminate "cackle" (Per Ford Bulletins 00-10-1, 00-22-1, and 01-14-6). Alliant Power provides OEM quality, without the OEM price. Keeping Original Equipment Manufacturer (OEM) product as the preferred service part so vehicles and equipment continue to perform like new and provide you with greater satisfaction. This is a single Injector.


OEM Part Numbers:

  • F81Z9E527EARM
  • XC3Z9E527AARM
  • F61Z9VE527ERM
  • 5C3Z9VE527ARM

Product Specs

SKU:
AP63804AE
Brand:
Alliant Power
height:
6

Related Products